Shower Valve and Tub Connections — Tampa

Tampa tub-and-shower update with mixing-valve rough-in, plumbing connections, an acrylic surround, and drywall preparation around the enclosure.

Shower Valve and Tub Connections — Tampa

Project Overview

The Challenge

The existing tub area needed access to the in-wall plumbing and a secure mixing-valve installation before the new enclosure could be fitted.

Our Solution

Opened the wet area, secured the valve and rough-in connections, installed the tub and acrylic surround, and patched the adjoining drywall.

The Outcome

The tub-and-shower enclosure was installed with updated plumbing connections and surrounding drywall prepared for paint.

Project Highlights

Project Details

Location: Tampa, FL

Duration: 2 days

Completed: 01/10/2026

Services Provided

Materials Used

Project Gallery

Shower valve brused nickel
Shower valve brused nickel
Moen shower valve
Moen shower valve
Acrylic walking shower
Acrylic walking shower

Back to Projects | Discuss a similar project